The crane arrives to set up the steel beams - 9/23/05
|
|
|
|
Getting ready for the steel
|
|
|
|
The structure begins to rise - 9/23/05
|
|
|
|
|
|
Getting the floor joists ready for installation - 9/30/05
|
|
|
|
|
|
Beginning to deck the floor - 10/6/05
|
|
|
|
|
|
|
|
|
|
The south wall being framed, the subfloor being completed - 10/6/05
|
|
|
|
|
|
|
|
|
|
The east wall is framed (10/12/05).
|
|
|
|
Further work on the east wall (10/17/05).
|
|
|
|
|
|
The doorway into the existing Dining Hall is framed (10/17/05).
|
|
|
|
The doorway to the back deck is framed (10/17/05).
|
|
|
|
The west wall is framed (10/24/05).
|
|
|
|
|
|
A look at the south wall (10/24/05).
|
|
|
|
The roof panels go on -- 10/27/05
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Installing a roof panel -- 10/28/05
|
|
|
|
|
|
Painting the siding on Camp Wightman Work Day - 10/29/05.
|
|
|
|
|
|
|
Camp Wightman Work Day also involved grading around the building - 10/29/05.
|
|
|
|