The crane arrives to set up the steel beams - 9/23/05

Getting ready for the steel

The structure begins to rise - 9/23/05

Getting the floor joists ready for installation - 9/30/05

Beginning to deck the floor - 10/6/05

The south wall being framed, the subfloor being completed - 10/6/05

The east wall is framed (10/12/05).

Further work on the east wall (10/17/05).

The doorway into the existing Dining Hall is framed (10/17/05).

The doorway to the back deck is framed (10/17/05).

The west wall is framed (10/24/05).

A look at the south wall (10/24/05).

The roof panels go on -- 10/27/05

Installing a roof panel -- 10/28/05

Painting the siding on Camp Wightman Work Day - 10/29/05.

Camp Wightman Work Day also involved grading around the building - 10/29/05.